2008奥运会羽毛球馆弦支穹顶预应力张拉模拟施工过程分析研究
张国军;葛家琪;秦杰;王树;王泽强;王敬仁;
Simulating analysis of prestressing construction process of the suspend-dome of the badminton gymnasium for 2008 Olympic Games
ZHANG Guojun1,GE Jiaqi1,QIN Jie2,WANG Shu1,WANG Zeqiang2,WANG Jingren3 (1.China Aeronautical Project and Design Institute,Beijing 100011,China;2.Beijing Building Construction Research Institute,Beijing 100039,China; 3.Beijing University of Technology,Beijing 100022,China)
建筑结构学报 . 2007, (06): 31 -38 .